Kütahya
Emet Waste Storage Dam

İşveren İdare : Emet Waste Storage Dam
Sözleşme Tarihi : 13-09-2013
Bitiş Tarihi : 30-09-2016
Proje Bedeli :

Proje Detayları

Construction of waste storage dam, which has 2.000.000 m3, capacity for General Directorate of Eti Mine Management located at Emet, Kütahya