İşveren İdare | : | Çine Çayı Flood Protection |
Sözleşme Tarihi | : | 28-04-2017 |
Bitiş Tarihi | : | 07-07-0202 |
Proje Bedeli | : |
Proje Detayları |
Located in Çine district of Aydın, the flood protection work, is being constructed on Çine Stream. Total length of the finished work is 17.600 meters. |