Aydın
Çine Çayı Flood Protection

İşveren İdare : Çine Çayı Flood Protection
Sözleşme Tarihi : 28-04-2017
Bitiş Tarihi : 07-07-0202
Proje Bedeli :

Proje Detayları

Located in Çine district of Aydın, the flood protection work, is being constructed on Çine Stream. Total length of the finished work is  17.600 meters.