İşveren İdare | : | Balıkesir Burhaniye Karadere Stream Protection |
Sözleşme Tarihi | : | 01-09-2016 |
Bitiş Tarihi | : | 05-06-2019 |
Proje Bedeli | : |
Proje Detayları |
Located in Burhaniye district of Balıkesir, the flood protection work, is being constructed on Karadere and Hıyarlık Streams. Total length of the finished work is 1380 meters. |