İşveren İdare | : | Bakırtepe Gold Mine Open Stripping and Ore Production |
Sözleşme Tarihi | : | 05-03-2017 |
Bitiş Tarihi | : | 30-06-2019 |
Proje Bedeli | : |
Proje Detayları |
14.000.000 m3 stripping work of Bakırtepe Gold Mine located in Kangal district of Sivas |