PROJECT PROJECT NAME SECTOR PROVINCE STATUS
Kayseri Develi Gümüşören Dam Dam Kayseri Completed
Edirne Keşan Göl-su Ponds Dam Edirne Completed
Düzce Akçakoca Dam Dam Düzce Completed
Road, Pavement and Engineering Structures Construction in Various Neighborhoods of Balıkesir Transportation Balıkesir Completed
Emet Waste Storage Dam Heightening Dam Kütahya Completed
Bored Pile Works at University of Karabük Landscape Karabük Completed
Balıkesir Dursunbey Ericek Pond and Irrigation Dam Balıkesir Completed
Balıkesir İli Ayvalık, Edremit, Havran, Burhaniye and Gömeç Districts Road Construction Transportation Balıkesir Completed
Balıkesir Organized Industrial Zone, Improvement of Roads and Laying Concrete Curbs Transportation Balıkesir Completed
Burhaniye Karadere Flood Protection Water Works Balıkesir Completed
Manisa Gördes Waste Storage Dam Heightening Work Mining Manisa Completed
Afyonkarahisar Sandıklı Ekinhisar Pond Dam Afyonkarahisar Completed
Altıeylül Aspalth Works Transportation Balıkesir Completed
Burhaniye Karıncadere 2. Phase Flood Protection Water Works Balıkesir Completed
Muğla Fethiye Arpacık Pond and Irrigation Dam Muğla Completed
Muğla Merkez Kozağaç Pond and Irrigation Dam Muğla Completed
Denizli Karakıran Kabaağaç Pond Water Works Denizli Completed
Kırkkalem Concrete Curb Vehicle Road Construction and Maintenance Transportation Balıkesir Completed
Çukuralan Open Mine Stripping and Gold Ore Production Mining İzmir Completed
Afyonkarahisar Sultandağı Doğancık Pond and Irrigation Dam Afyonkarahisar Completed
Maintenance of Various Roads and Concrete Curb, Bituminous Emulsion Production at Several Neighbourhoods of Balıkesir Transportation Balıkesir Completed
Balıkesir - Susurluk District Hatap Stream Flood Protection Water Works Balıkesir Completed
Bilecik Gölpazarı Akçay Dam Dam Bilecik Completed
Tanap Project, Georgia Section Natural Gas Line Infrastructure Works Petrochemical Gürcistan Completed
Earthworks of Awash - Kombolcha - Hara Gebaya Railway Federal Democratic Republic of Ethiopia Transportation Etiyopya Completed
Emet Waste Storage Dam Dam Kütahya Completed
Balıkesir Bigadiç Gediktepe Campus Concrete Foundation and Infrastructure Works Mining Balıkesir Completed
Kütahya Tavşanlı Doğanlar Pond Dam Kütahya Completed
Afyonkarahisar Sultandağı Kırca Pond and Irrigation Dam Afyonkarahisar Completed
Balıkesir Merkez Yandereler 4. Phase Flood Protection Water Works Balıkesir Completed
Bakırtepe Gold Mine Heap Leach and Pool Construction Mining Sivas Completed
Eskişehir Kaymaz Open Mine Stripping Mining Eskişehir Completed
Manisa Gördes Waste Storage Dam Mining Manisa Completed
Afyonkarahisar Sinanpaşa Çayhisar 27 Ağustos Pond and Irrigation Dam Afyonkarahisar Completed
Uşak Merkez İlyaslı ve Merkez Karakuyu Pond and Irrigation Dam Uşak Completed
Afyonkarahisar Çay Deresinek Regulator and Sultandağı Kırca Pond and Irrigation Dam Afyonkarahisar Completed
İzmir Kiraz Haliller Pond and Irrigation Dam İzmir Completed
Denizli Kale Narlı Irrigation Water Works Denizli Completed
Balıkesir Burhaniye Çoraklıtepe Mine Open Stripping and Ore Production Mining Balıkesir Completed
Manyas 2nd Phase Ergili Pumped Irrigation Water Works Balıkesir Completed
Earthworks of Kosovo Highway Project Transportation Kosova Completed
Uşak Banaz Karaköse Pond Dam Uşak Completed
Manisa Gördes Çiçekli Pond Dam Manisa Completed
Kandil Dam Relocation Road Transportation Kahramanmaraş Completed
Balıkesir - Bigadiç Highway Project Transportation Balıkesir Completed
Karabük Eflani Highway Earthworks and Asphalt Works Transportation Karabük Completed
Kütahya Emet Konuş Pond and Irrigation Construction Dam Kütahya Completed
Sandıklı Kestel Water Dam and Irrigation Construction Dam Isparta Completed
Kastamonu Highway Project Transportation Kastamonu Completed
Edirne Keşan Beyköy Pond and Irrigation Construction Dam Edirne Completed
Albania Highway Project Transportation Arnavutluk Completed
Balıkesiri, Several Neighbourhoods Road Construction Transportation Balıkesir Completed